When the Santa Barbara
Courthouse was constructed, it only had two original courtrooms;
Department One and Two. Department One is directly above the boiler
plant in the basement, two floors down. The exhaust duct is inside the
plastered walls and very difficult to access. As the duct rises, it
takes a 90 degree turn over the entry door to this courtroom. It is
this flat section of duct that failed due to rust over the years.
After a few years of water damage, the plaster and Mudejar ceiling
just of the entry door to Department One also began to failed. Aside
from failing plaster, posing a safety hazard, the Mudejar
(dutch-metal) painted surfaces were also in desperate need of rescue.
Funds were obtained to take care of this much needed repair.
Feb.
25, 2004
v
Mar. 4, 2004 v
Mar. 8, 2004
v Mar.
18, 2004

Courtroom as seen from the audience...

(left) Damage above
corbel----(right) damage near vertical duct run within wall...

Another view of the damaged
plaster and painted surfaces...

Painters at work...

Scaffold as seen from the Judges
chair...
We really
appreciate the Judge allowing the work to continue--disrupting his
calendar.
|